WGCA LERB Appeals
Key Words Synopsis Railroad Result Decision Organization Appeal Organization Exhibits Carrier Response Miscellaneous Doc
CFR Part 240 in its entirity Part 240 in its entirity FRA           CFR Part 240
CFR Part 240 Subpart E - Dispute Resolution Federal Regulations for LERB Dispute Resolution FRA           Dispute Resolution
CFR Part 240.407 FAQ Frequently Asked Questions regarding request for an administrative hearing under 240.407 FRA           FAQ 240.407
Example LERB Example - How to file and what to  include UPSR     LERB Example.pdf      
Form B violation Occupying track without authority - Engineer not qualified over territory properly by UP UPWL Won Decision        
Passing Signal displaying stop Passing Signal without authority - LERB was filed by Peitiioner McCarthy on his own behalf as 1st Vice General Chairman of the SP Eastern Lines Committee SPEL Won Decision Organization Case   Carrier Response  
Passing Signal displaying stop Passing a switch point indicator on KCS was NOT considered a violation of 49 CFR 240.117(e)(1) CNIC  Won Decision        
Policy BLE UP Southern Region LERB Policy UPSR           BLE UP Southern Region LERB POLICY.htm
Red Signal Violation Stop Signal Violation - contains great language on what is required - allowed by the carrier in testing signals. UPWL Won Decision        
Restricted Speed violaiton Restricted speed violation resulting in derailment on main track after running through a switch UPWL Won Decision        
Speeding Exceeding maxium speed by a great amount in 3.2% grade territory - operated by student engineer the instructor engineer did not have proper qualificaiton either UPWL Won Decision        
Speeding Exceeding maximum authorized speed by 1 mph with a 40 mph restricted train when provided paperwork showing train was good for 50 mph. UPSR Won Decision Organization Case      
Stop Test Red Signal - "little red light test" - Petitioner passed red light LERB found not providing the light for testing to be infringement of petitioner's rights  EQAL 01-53 UPSR Won Decision Organization Case      
Stop Test Red Fusee Stop Test - Petitioner passed burning Fusee LERB found procedural grounds to overturn - hearing officer turned into charging officer - new charge issued at the hearing and no postponement was granted to prepare for the charge CNIC Metra Won Decision        
Stop Test Red Signal - "little red light test" - Petitioner passed red light LERB found test invalid - not relevant to any railroad procedure EQAL 01-82 UPSR Won Decision        
Unauthorized Track Entry Petitioner entered main track without authority - waived company discipline rule 230 - carrier tried to make that waiver stand for decertification under 307 - LERB said no, must happen through CNIC Won Decision        
Unauthorized Track Entry Enterning track without authority - passing meet point requiring crew to head into track in TWC territory EQAL 01-24 UPSR Lost Decision Organization Case Organization Exhibts Carrier Response Miscellaneous Doc
Unauthorized Track Entry Petitioner entered track without authority - testimony developed that petitioner had asked on several occasions for clarification from his supvisor but was refused - LERB found procedural error and substantail harm. CNIC GWWR Won Decision        
Unauthorized Track Entry Occupying track without authority - Conductor mistakenly released the wrong track warrant resulting in Petitioner's train occupying 1 mile segment of track without authority. UPSR Pending Pending Organization Case      
Unauthorized Track Entry Occupying track without authority - training of engineer and conductor on new track warrant territory was inadequate UPWL Won Decision        
Unauthorized Track Entry Occupyint track segement without authority Pecos TX engineers not responsible for improper instructions while operating train UPWL Won Decision